AS29

Construction

09/24/2000

The lower part of the hull is built upside down
and finished with
System Three's Copperpoxy.

Turning the hull gets the adrenaline flowing, but should not present serious problems.

Iris lifting the hull alone

Pre coating side panels and bulkheads
During the winter months temperatures were too low for epoxy work in the workshop. With good (very good!) sanding equipment even working in the living room is possible.

The lower hull is a perfect place for
scarfing the side panels.

Erecting the 
upper bulkheads

Interior construction prior to installing the upper side panels

tn_2805f
tn_2805d
tn_0406d tn_0406c
tn_2805e